
Combined Mechanical and Electrical Services O&M Manual | University Campus of Football Business – Wembley, UK
Providing unparalleled opportunities for aspiring athletes and sportspeople to complete degrees in the football and sports industry, the Wembley site of the University Campus of Football Business (UCFB) is a unique educational complex that houses the iconic Wembley Stadium at the heart of its grounds. With a capacity of 90,000, Wembley is the biggest stadium in the UK and home to the world-famous England football team who progressed amazingly through the Euro 2020 competition. The UCFB Wembley campus boasts a wide range of facilities, including lecture theatres, seminar rooms, quiet study areas, a library and media suites.
In 2021, Kershaw Mechanical Services completed a vast array of mechanical and electrical services for a Level 2 fitout at the campus, including but not limited to:
- A VRF air conditioning system
- A split wall mounted air conditioning system
- Exhaust systems
- A sewer drainage system
- A domestic cold water system
- A domestic hot water system, complete with an electric hot water unit
- General power, complete with RCD protection
- General lighting
- Exit and emergency lighting
Utilising a format specific to the client, Dewick & Associates prepared a detailed O&M Manual that incorporated:
- Design data
- A summary and detailed Scope of Works
- System descriptions
- Equipment schedules
- A spares’ schedule
- Key contact details
- An Asset Register
- A Health and Safety File
- Manufacturer literature
- Maintenance procedures
- Record drawings
- Commissioning and test results
Mechanical Services Contractor: Kershaw Mechanical Services