Mechanical Commissioning Plan plus Electrical, Hydraulic and Mechanical Services O&M Manuals | Harley Dental, North Adelaide – SA

Harley Dental, a prosthodontics team specializing in reconstructive dentistry, replacement of missing teeth and natural teeth restoration, have clinics in Adelaide City and Kent Town. In 2021 the specialists expanded their practice, opening an additional clinic in North Adelaide, fitted with state-of-the-art tools to treat complex dental conditions and restore patients’ teeth for optimum function and aesthetics.

Dewick & Associates completed the Mechanical Operating & Maintenance Manual and Commissioning Plan for the associated refurbishment works which involved the supply and installation of VRV air conditioning systems, outside air systems, toilet and general exhaust air systems. In addition to the scope, the Manual collated technical data, As Built Drawings and maintenance log sheets for ongoing care and maintenance, whilst the Commissioning Plan contained commissioning procedures and test sheets utilized for configuring and finalizing the installation.

As the project progresses, Dewick & Associates will deliver the Electrical and Hydraulic Operating & Maintenance Manual to complete the portfolio of documents.

Electrical Services Contractor: Diverse Power and Data Solutions
Hydraulic Services Contractor: Systematic Plumbing
Mechanical Services Contractor:
Glow Heating Cooling Electrical

Subscribe to our email newsletter to receive the latest news and updates

"*" indicates required fields